Bathroom Progress, Day 4

Photograph taken by on Sunday, November 05, 2017
Bathroom Progress, Day 4

Bathroom Progress, Day 4

The difference between the beginning of day one and the end of the same day were more obvious than the difference between the end of day one and the end of day four. Of course, day four was Friday and it is now Sunday but of course the bathroom is in the same state today as it was at the end of the day on Friday. In the top of the picture you can see a black box in the ceiling. That’s the new exhaust fan. There are also two recessed light fixtures above what will be the shower. Another not so obvious change is the air duct that used to open in the floor in the far right and which now comes up in the wall in the foreground on the right.

The place where there was a door to outside is closed in, as it was on the first day. You cannot see it in this photo, of course, but the siding is up on the outside of that and if you didn’t know a door had been there, you might not be able to tell. There are a few signs left, but they are minor and will be taken care of in due course.

I picked out floor and wall tile yesterday and bought one of each so the builder could measure the thicknesses and get the transition from floor to shower nice and smooth. He needs that calculation before he can install the shower pan. Also, the plumber is supposed to come tomorrow and we should be able to do laundry again, which will be nice.

Comments are closed.