Bathroom Progress, Day 7

Photograph taken by on Thursday, November 09, 2017
Bathroom Progress, Day 7

Bathroom Progress, Day 7

Today is work day 8 but this picture was taken in the morning before any work had been done today, so it reflects 7 days of work on the laundry room to bathroom conversion. As you can see, the plumbing is pretty much all done in the wall. The electrician came today and removed the 220 volt outlet that was used by the electric drier we had when we moved in (our current drier is gas). That’s right in the middle of this photograph. Another thing to notice in this picture is the joist that would have been directly under the drain in the shower pan. That required a little reworking of the supporting structure. The two joists on either side were doubled up and cross pieces put in to hold the end of the central joist, which had to be cut. The shower pan went in today, as well.

Comments are closed.