Bathroom Progress, Day 19

Photograph taken by on Tuesday, November 28, 2017
Bathroom Progress, Day 19

Bathroom Progress, Day 19

Counting only work day’s, of course, and with some delays in terms of getting the inspections, we’re up to day 19. As you can see, the tile walls for the shower are up. The strip of red showing at the bottom is a rubber sealant that covers the entire sub-floor. That will be tiles over with 18 inch squares of a similar color to the walls. The shower floor will have the 2 inch tiles you can see in this picture (but those are not fastened down at this point, just sitting there and ready to go pretty soon. The two bottom rows of tile on the shower walls will go in after the floor (because they rest on the floor tiles. Anyway, it’s coming along.

Comments are closed.