Street Repaving

Photograph taken by on Monday, July 17, 2023
Street Repaving

Street Repaving

If you recall, on Wednesday, July 5 the folks from W.S.S.C. came to repair the pipe leading to our house from the local water main. They dug two large holes, both more than six feet deep in the road. By the time they were done, the holes were filled and topped with fresh asphalt. The next day a crew came and paved them more cleanly, rolling the asphalt. Well, now, less than two weeks later, a third crew came and milled about 50 yards of the road and going about the same distance up the court leading off of it. Once it was milled, the put down new paving. It certainly looks a lot better and takes care of other seams and cracks in the pavement that have accumulated over the years. This is the milling machine, grinding up the top two or three inches of the existing pavement. It’s definitely a small version, only taking up about four feet width of pavement at a time. Nothing compared to those that will mill a full lane of roadway, but it’s more suitable to a suburban street, I suppose.

Comments are closed.