Bathroom Progress, Day 4

Bathroom Progress, Day 4

Bathroom Progress, Day 4

The difference between the beginning of day one and the end of the same day were more obvious than the difference between the end of day one and the end of day four. Of course, day four was Friday and it is now Sunday but of course the bathroom is in the same state today as it was at the end of the day on Friday. In the top of the picture you can see a black box in the ceiling. That’s the new exhaust fan. There are also two recessed light fixtures above what will be the shower. Another not so obvious change is the air duct that used to open in the floor in the far right and which now comes up in the wall in the foreground on the right.

The place where there was a door to outside is closed in, as it was on the first day. You cannot see it in this photo, of course, but the siding is up on the outside of that and if you didn’t know a door had been there, you might not be able to tell. There are a few signs left, but they are minor and will be taken care of in due course.

I picked out floor and wall tile yesterday and bought one of each so the builder could measure the thicknesses and get the transition from floor to shower nice and smooth. He needs that calculation before he can install the shower pan. Also, the plumber is supposed to come tomorrow and we should be able to do laundry again, which will be nice.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 4

Bathroom Progress, Day 7

Bathroom Progress, Day 7

Bathroom Progress, Day 7

Today is work day 8 but this picture was taken in the morning before any work had been done today, so it reflects 7 days of work on the laundry room to bathroom conversion. As you can see, the plumbing is pretty much all done in the wall. The electrician came today and removed the 220 volt outlet that was used by the electric drier we had when we moved in (our current drier is gas). That’s right in the middle of this photograph. Another thing to notice in this picture is the joist that would have been directly under the drain in the shower pan. That required a little reworking of the supporting structure. The two joists on either side were doubled up and cross pieces put in to hold the end of the central joist, which had to be cut. The shower pan went in today, as well.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 7

Bathroom Progress

Bathroom Renovation

Bathroom Renovation

We finally got the plumbing and electrical inspections needed so that the walls can now be closed up. I had a meeting this morning with Marc, our general contractor, David, who is doing most of the actual work, and Andy, our occupational therapist. We discussed and agreed on locations for grab bars, etc., so proper backing could be installed before the walls are closed. Needless to say, these things have to be done in the right order. Much of the progress over the last week and a half has been in the basement and in the walls. We now expect progress to be much more visible as the walls are closed and the tile is installed.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress

Bathroom Progress, Day 19

Bathroom Progress, Day 19

Bathroom Progress, Day 19

Counting only work day’s, of course, and with some delays in terms of getting the inspections, we’re up to day 19. As you can see, the tile walls for the shower are up. The strip of red showing at the bottom is a rubber sealant that covers the entire sub-floor. That will be tiles over with 18 inch squares of a similar color to the walls. The shower floor will have the 2 inch tiles you can see in this picture (but those are not fastened down at this point, just sitting there and ready to go pretty soon. The two bottom rows of tile on the shower walls will go in after the floor (because they rest on the floor tiles. Anyway, it’s coming along.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 19

Grandma’s Bedroom

Grandma's Bedroom

Grandma’s Bedroom

I’ve posted a few pictures of the progress that’s being made on the new bathroom and I’ll put up another one soon, but tonight I thought I’d post a picture of grandma’s new bedroom, formerly our family room. Well, lately it’s been neither. It’s been the storage and work room for out builder, and in this picture you can see tools, two doors leaning up against the shelves, the hardwood flooring for the new hall, and even the bathroom sink faucet in the upper left. Later this week lights will be installed in the ceiling of this room and next week the carpet should come up and the floor refinished (along with the new floor in the hall).

Categories: Miscellaneous | Tags: , | Comments Off on Grandma’s Bedroom

Bathroom Progress, Day 28

Bathroom Progress, Day 28

Bathroom Progress, Day 28

The bathroom is very nearly done. In this picture you can see the sink and toilet, which went in on Friday, as well as the mirror and vanity light fixture, which went in today along with the fold-down grab-bar between the toilet and the sink. You can see the hole in the door for the knob in the lower right. That and the knobs in the other doors will go in tomorrow. There is some painting to do in the kitchen, hall, and new bathroom. The shower curtain rod is on order and should be here next week. The curtain should come tomorrow. Once I have the rod and it’s up, the bathroom itself will be done. On Thursday the floor crew should be here to put new hardwood in the hall and to refinish that and the old hardwood in the bedroom (formerly the family room). Also on Thursday the ramp to the front door should be done. We are very close. Of course, the entire house needs to be dusted pretty badly. No point in doing that before the work is finished, though.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 28

Grandma’s Bedroom, Part 2

Grandma’s Bedroom, Part 2

Grandma’s Bedroom, Part 2

Nine days ago (see Tuesday, December 05, 2017) I posted a picture titled Grandma’s Bedroom. That showed our former family room full of tools, building supplies, and a bit of waste. The room has changed pretty drastically since then, mostly in the last few days. When I got home on Tuesday the room was empty and the carpet was gone (well, it was in small rolls on at the top of the driveway. Today, the floor was refinished. I have to say, it looks pretty nice. Certainly better than the old carpet. It’s closed up now, so that the top coat can dry. And of course the house smells pretty bad. But that will fade, eventually.

Categories: Miscellaneous | Tags: , | Comments Off on Grandma’s Bedroom, Part 2

Fourth Pres. Sanctuary Renovation

Fourth Pres. Sanctuary Renovation

Fourth Pres. Sanctuary Renovation

When I started posting a photo a day, back in 2011, I only posted one photo a day to my regular blog (and that’s all I’ve moved here from that first year). I had a second collection called Project 365 Extra that occasionally had additional photos. Since then I’ve been less strict about it and would post multiple photos for any given day, sometimes as a single post with multiple photos and sometimes as separate posts. This is my third and final post for today. We went to the Fourth Presbyterian Church evening service for a hymn sing. Getting there a little early, I got permission to take a few photos of the sanctuary renovation in progress.

Categories: Miscellaneous | Tags: , , , | Comments Off on Fourth Pres. Sanctuary Renovation