Tagged With: Renovation

Bathroom Progress

Bathroom Renovation

Bathroom Renovation

We finally got the plumbing and electrical inspections needed so that the walls can now be closed up. I had a meeting this morning with Marc, our general contractor, David, who is doing most of the actual work, and Andy, our occupational therapist. We discussed and agreed on locations for grab bars, etc., so proper backing could be installed before the walls are closed. Needless to say, these things have to be done in the right order. Much of the progress over the last week and a half has been in the basement and in the walls. We now expect progress to be much more visible as the walls are closed and the tile is installed.

Categories: Miscellaneous | Tags: , , | Leave a comment

Bathroom Progress, Day 7

Bathroom Progress, Day 7

Bathroom Progress, Day 7

Today is work day 8 but this picture was taken in the morning before any work had been done today, so it reflects 7 days of work on the laundry room to bathroom conversion. As you can see, the plumbing is pretty much all done in the wall. The electrician came today and removed the 220 volt outlet that was used by the electric drier we had when we moved in (our current drier is gas). That’s right in the middle of this photograph. Another thing to notice in this picture is the joist that would have been directly under the drain in the shower pan. That required a little reworking of the supporting structure. The two joists on either side were doubled up and cross pieces put in to hold the end of the central joist, which had to be cut. The shower pan went in today, as well.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 7

Bathroom Progress, Day 4

Bathroom Progress, Day 4

Bathroom Progress, Day 4

The difference between the beginning of day one and the end of the same day were more obvious than the difference between the end of day one and the end of day four. Of course, day four was Friday and it is now Sunday but of course the bathroom is in the same state today as it was at the end of the day on Friday. In the top of the picture you can see a black box in the ceiling. That’s the new exhaust fan. There are also two recessed light fixtures above what will be the shower. Another not so obvious change is the air duct that used to open in the floor in the far right and which now comes up in the wall in the foreground on the right.

The place where there was a door to outside is closed in, as it was on the first day. You cannot see it in this photo, of course, but the siding is up on the outside of that and if you didn’t know a door had been there, you might not be able to tell. There are a few signs left, but they are minor and will be taken care of in due course.

I picked out floor and wall tile yesterday and bought one of each so the builder could measure the thicknesses and get the transition from floor to shower nice and smooth. He needs that calculation before he can install the shower pan. Also, the plumber is supposed to come tomorrow and we should be able to do laundry again, which will be nice.

Categories: Miscellaneous | Tags: , , | Comments Off on Bathroom Progress, Day 4